Independent design team
New Ladder Decoration Design
New ladder decoration installation
Old ladder decoration update
Old ladder decoration installation
inquiry
Design
Process
Preparation
Acceptance
Payment
Complete
After Sales *
* After completing the decoration and running for three months, our company conducts operational evaluation and testing on the elevator to ensure its safety.
1. Safety Code for Elevator Manufacturing and Installation (GB7588-2003)
2. Code for Quality Acceptance of Building Decoration and Decoration Engineering (GB50210-2001)
3. "Code for Acceptance of Construction Quality of Building Ground Engineering" (GB50209-2002)
4. Construction Code for Residential Decoration and Decoration Engineering (GB50327-2001)